Search
Categories
Archives
Sponsored Links
Follow Us on Twitter:

    “Richfield Today” – Wednesday, Feb. 4; Crosstown construction reaches half-way point


    Richfield residents will be happy to hear that the Crosstown construction has hit the half-way mark. The four-year project is expected to take another two years to complete. Drivers are encouraged to slow down in work zones and never enter a roadway that has been blocked with barriers or cones. For statewide traffic, construction and travel information dial 511 or visit www.511mn.org. … MnDot Richfield Minnesota “Mike Opat” “Crosstown construction”

    Post to Twitter

    Leave a Reply

    ClickBank Products
    Other Sponsors

    Check out some more of my sites:

    http://featurely.com

    http://healthroutines.cm

    Powered by Yahoo! Answers

    Twitter links powered by Tweet This v1.6.1, a WordPress plugin for Twitter.